PRODUKTIVITAS KERJA PADA PELAYANAN TIKET DI PT. PELNI SORONG DENGAN METODE STOPWATCH TIME STUDY
DOI:
https://doi.org/10.33506/mt.v8i2.2016Keywords:
SStopwatch Time Study, Work Sampling, Produktivitas KerjaAbstract
Measurement of work productivity or work measurement is an attempt to determine the length of work required by an operator or worker in completing a specific job at a normal work speed level in the best work environment at that time. As a national company PT. Pelni is always required to provide good service. For this reason, it is necessary to know the standard of service time for PT. Pelni Sorong branch and measuring employee productivity. In this study, we use a Stopwatch Time Study to collect the data needed to meet the needs of the work sampling calculation process. After doing the research, the total standard time is obtained as follows: (1) for employee 1 on day 1 which is 390,225 seconds or 6,504 minutes (2) for employee 2 on day 1 which is 390,590 seconds or 6,526 minutes (3) for employee 1 on day 2 which is 388,366 seconds or 6,473 minutes (4) for employee 2 on day 2 which is 402.87 seconds or 6,715 minutes, each to serve 1 ticket purchase. The calculation results show the level of work productivity as follows: (1) on employee 1 on day 1 it reaches 77% (2) on employee 2 on day 1 of 68% (3) on employee 1 on day 2 of 68% (4) on employee 2 on day 2 by 67%.
References
Afiani, R., dan Pujotomo, D. Analisis waktu baku dengan metode stopwatch time study, studi kasus cv. mans group. Skripsi: Universitas Brawijaya, Malang. (2021)
Cahyawati, A. N., Munawar, F. A., Anggraini, A., dan Rizky, D. A. (2018). Analisis pengukuran kerja dengan menggunakan metode stopwatch time study. Seminar Nasional teknologi dan Rekayasa (SENTRA). ISSN: 2527-6042
Desi kusmindari dan Andang aprianto, (2009). Produktivitas Dan Pengukuran Kerja Proses Produksi Medium Dencity Fibreboard (MDF). Jurnal Ilmiah Tekno.
Erlendsson. (2006). Analisis pengukuran waktu kerja operator dan produktivitas kerja. Jurnal teknik industri.
Kumar (2010). Hubungan Antara Beban Kerja Dengan Kinerja Pada Karyawan Balai Permasyarakatan Kelas 1 Jakarta Selatan (BAPAS) Di Jakarta Timur. Jurnal Pendidikan Ekonomi Dan Bisnis.
Nugrahayu (2014). Analisis pengukuran waktu kerja operator dan usulan perbaikan dengan work sampling di Mcdonald’s hayam wuruk. Jakarta: Teknik industri
Rahayu (2014). Analisis pengukuran waktu kerja dengan stopwatch time study untuk meningkatkan target produksi di PT. XYZ
Rahman, dkk (2006). Analisis Pengukuran Kerja Dengan Menggunakan Metode Stopwatch Time Study. Seminar Nasional teknologi dan Rekayasa.
Sutalaksana. (2005). Optimasi jumlah tenaga kerja berdasarkan waktu standard. Jurnal teknik industri.
Sutanto. (2016). Pengukuran Waktu Kerja Operator Crane Di PT Syenergi Indonesia Menggunakan Metode Work Sampling. Jurnal Industri Kreatif .
Yusfita. (2004). Analisis Produktivitas Tenaga Kerja terhadap PT. Pelni Makasar. Makasaar: Universitas Hasanuddin.
Wignjosoebroto, S. (2006). Pengantar Teknik dan Manajemen Industri. Jakarta: Penerbit Guna Widya.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 Masniar Masniar, Ashar Ashar, Orgenes Paulus Atanay
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.