[1]
K. Khoirul, H. Pristianto, and M. Rusmin, “ANALISIS PENYEBAB KETERLAMBATAN PEKERJAAN KONSTRUKSI JEMBATAN”, JTSRB, vol. 2, no. 2, pp. 27–36, Jun. 2019.