Khoirul, K., Pristianto, H., & Rusmin, M. (2019). ANALISIS PENYEBAB KETERLAMBATAN PEKERJAAN KONSTRUKSI JEMBATAN. Jurnal Teknik Sipil : Rancang Bangun, 2(2), 27–36. https://doi.org/10.33506/rb.v2i2.481