[1]
R. S. Musa, N. N. Azzat, G. Muhammad, D. R. Sulistyawati, and B. Lofian, “Implementation of the Earliest Due Date Method in Sample Production Scheduling of Cushion Products at PT XYZ”, Metode, vol. 12, no. 1, pp. 108–121, Mar. 2026.