Musa, R. S. (2026) “Implementation of the Earliest Due Date Method in Sample Production Scheduling of Cushion Products at PT XYZ”, Metode : Jurnal Teknik Industri, 12(1), pp. 108–121. doi: 10.33506/mt.v12i1.5289.