Khoirul, K., Pristianto, H. and Rusmin, M. (2019) “ANALISIS PENYEBAB KETERLAMBATAN PEKERJAAN KONSTRUKSI JEMBATAN”, Jurnal Teknik Sipil : Rancang Bangun, 2(2), pp. 27–36. doi: 10.33506/rb.v2i2.481.